Sandvik Mining – Heatherbrae

Sandvik Mining – Heatherbrae

Sandvik Mining – Heatherbrae LIGHTING  |  INDUSTRIAL Annual Savings $67,000 + GST 470 tonnes CO2 Problem Industrial lighting contributed approximately 51% of the site’s electrical consumption. The relatively new site was looking at ways to reduce its fixed...
AB Mauri – Cereform

AB Mauri – Cereform

AB Mauri Cereform SOLAR  |  MANUFACTURING Annual Savings $19,558 + GST 137.8 tonnes CO2 Problem AB Mauri Cereform wanted to lower their carbon footprint. Having already undertaken their lighting, air compressors and power factor correction, it was decided to review a...