Whittaker Contracting

Whittaker Contracting

Whittaker Contracting LIGHTING  |  MANUFACTURING Problem The lighting at Whittaker Contracting has previously been an issue Regular maintenance required due to the long hours of operation Solution Replaced 29 x 400W Metal Halide lighting Installed 29 x 200W Renewtech...
Tyree Industries

Tyree Industries

Tyree Industries LIGHTING  |  MANUFACTURING Annual Savings $62,080 + GST 526.5 tonnes CO2 Problem Lighting contributed approximately 20% of the site’s electrical consumption The site was dark, with the old lighting being unreliable and expensive to operate Solution...
Downer EDI Rail – Cardiff

Downer EDI Rail – Cardiff

Downer EDI Rail – Cardiff LIGHTING & AIR COMPRESSORS  |  INDUSTRIAL Annual Savings $139,535 + GST 995 tonnes CO2 Problem The energy costs on site became excessive, and a survey revealed lighting on site contributed more than 73.5% of the site’s total...