by info@energyandcarbon.com.au | Sep 21, 2015
GWF Speedibake AIR COMPRESSORS | MANUFACTURING Annual Savings $55,668 + GST 399 tonnes CO2 Problem The plant used four aging compressors to supply a total 34.8 m3/min: 1 x Atlas Copco GA355(55kW) 2 x CompAir RA60(45kW) 1 x CompAir Broomwade 6100(75kW) The...
by info@energyandcarbon.com.au | Sep 20, 2015
AB Mauri Cereform SOLAR | MANUFACTURING Annual Savings $19,558 + GST 137.8 tonnes CO2 Problem AB Mauri Cereform wanted to lower their carbon footprint. Having already undertaken their lighting, air compressors and power factor correction, it was decided to review a...
by info@energyandcarbon.com.au | Sep 20, 2015
Downer EDI Rail – Cardiff LIGHTING & AIR COMPRESSORS | INDUSTRIAL Annual Savings $139,535 + GST 995 tonnes CO2 Problem The energy costs on site became excessive, and a survey revealed lighting on site contributed more than 73.5% of the site’s total...