by info@energyandcarbon.com.au | Sep 10, 2019
Downer EDI Rail – Auburn AIR COMPRESSORS | INDUSTRIAL Annual Savings $16,413 + GST 139 tonnes CO2 Problem An Ultasonic Compressed Air Survey was undertaken at the Downer Auburn Maintenance Centre (AMC) to locate, tag, report and quantify the compressed air...
by info@energyandcarbon.com.au | Jul 16, 2019
Downer EDI Rail – Newport AIR COMPRESSORS | INDUSTRIAL Annual Savings $101,837 + GST 1015 tonnes CO2 Problem The client sought to reduce energy consumption and improve efficiency across the site. Solution In the initial assessment, we determined that the...
by info@energyandcarbon.com.au | Mar 29, 2019
OJI AIR COMPRESSORS | INDUSTRIAL Annual Savings $23,400 + GST 160 tonnes CO2 Problem OJI had an installed Atlas Copco GA75VSD (75kW) that failed the airend, and an unreliable Compare L75S (75kW) which both ran together inefficiently. With poor reliability during...
by info@energyandcarbon.com.au | Oct 16, 2018
Unilever AIR COMPRESSORS | INDUSTRIAL Annual Savings $204,191 + GST 1315 tonnes CO2 Problem The compressed air system was over 25 years old, and very energy inefficient due to competing compressors. Energy prices increased from $0.069 to $0.139 kWh, driving the cost...
by info@energyandcarbon.com.au | Sep 21, 2015
Austral Bricks AIR COMPRESSORS | MANUFACTURING Problem The Atlas Copco GA90C FF load/unload 90kW compressor was old and unreliable and had reached the end of its life. The load/unload control system was inefficient in managing the plant’s variable air demands across...